Zeus Robotics Team

Search This Blog

Tuesday, November 9, 2010

Posted by Steve at 9:16 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Useful Team Links

  • Team Expense Report
  • Team Schedule Google Docs

Blog Archive

  • ▼  2010 (18)
    • ►  December (8)
    • ▼  November (9)
      • Linkage assembly and testing (MCM)
      • a quick look at some parts
      • This week our Most Critical Module needs to be man...
      • Linkage Connector
      • This week the following parts were manufactured. T...
      • Today Trevor and I we fortunate enough to be able...
      • Design is for entire slotbot is very close to bein...
      • No title
      • No title
    • ►  October (1)

About Us

  • Colin
  • Ryan
  • Steve
  • Trevor
Awesome Inc. theme. Powered by Blogger.